BIM – Construction Stage

Amador Convention Center, 4D analysis. The Center is a structure with capacity for more than 20 thousand people, a construction area of ​​63 thousand m2, of which 42 thousand m2 represent leasable area for various types of events. Likewise, it has an exhibition area of ​​15,400 m2, a banquet area of ​​4,095 m2 and 1,700 parking spaces, including an area for buses.

4D BIM Panama, BIM y Construcción

4D analysis, common parking module. Simulation with different zones, distribution of resources in 4 teams and personnel at the parking lot level, 2 teams and personnel at the tower level. Working independently, analysis with a crane.

AMW tower, existing storm drawer conflict to be removed. In the 4D analysis, one of the scenarios is visualized with respect to an existing storm drain to be removed, the manufacture of the new box and the pile wall, with their respective anchors. 4D conflicts, it is not about the arrangement of the geometry but the space-time impact.

“Los Lagos” Comprehensive Training Educational Center, Analysis of resources and performance by sector – BIM – Virtual Construction Model (VCM)

 

Share